• Cooling Plate for EV Aluminium Water Cold Housing Liquid Cooling Enclosure
  • Cooling Plate for EV Aluminium Water Cold Housing Liquid Cooling Enclosure
  • Cooling Plate for EV Aluminium Water Cold Housing Liquid Cooling Enclosure
  • Cooling Plate for EV Aluminium Water Cold Housing Liquid Cooling Enclosure
  • Cooling Plate for EV Aluminium Water Cold Housing Liquid Cooling Enclosure
  • Cooling Plate for EV Aluminium Water Cold Housing Liquid Cooling Enclosure

Cooling Plate for EV Aluminium Water Cold Housing Liquid Cooling Enclosure

Material: Aluminium+Copper
OEM/ODM: Available
Model No: Customized
Joint Method: Fsw+TIG
Performance Testing: Yes
Transport Package: Stanard Package+Pallet
Samples:
US$ 300/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Manufacturer/Factory, Trading Company
Gold Member Since 2024

Suppliers with verified business licenses

Guangdong, China
Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Fast Delivery
The supplier can deliver the goods within 30 days
R&D Capabilities
The supplier has 1 R&D engineers, you can check the Audit Report for more information
to see all verified strength labels (11)

Basic Info.

Model NO.
Water Cold housing
Specification
Customized
Trademark
JADE
Origin
China
HS Code
7610900000
Production Capacity
100PCS/Day

Product Description

Product Description
 
Material: AL or Cu
Size: According to 2D, 3D drawing
Finish Anodizing,Painting,Powder Coating,electrophoresis,Passivation,Sand Blasting,Plating,Blackening,Polishing...
Lead Time Normally 4 weeks
Main process CNC, Tube&Joint manufacturing,Soldering/pressing/welding,Surface Treatment, Assembly, Inspection, Package, etc
Certificates &Standard ISO9001, IATF16949, ROHS
Cooling Plate for EV Aluminium Water Cold Housing Liquid Cooling Enclosure

Cooling Plate for EV Aluminium Water Cold Housing Liquid Cooling Enclosure

The Typical Uses:

1,Industry
2,Medical
3,New energy/ Storage
4,AI server
5,LED..etc
Cooling Plate for EV Aluminium Water Cold Housing Liquid Cooling Enclosure

Our Advantages :

1:More than 10 years of thermal product fabrication and R&D experience.
2:One-stop services from design simulation,mold manufacture, soldering/brazing, metal stamping, CNC,  assemble, and performance testing.
3:Each lot will offer the RoHS and REACH certification.
4:Professional R&D engineer team to support you.

Why Choose Us:

1. NormativeControl quality process
2. Professional engineer team could offer the best products.
3. The most advanced techology ensures the process and capacity.
4. We built long-term cooperation with raw material manufacturers, ensuring supply capacity and competitive price.
5. Experienced team will serve you with pre-sale consulting and after-sale supporting.


Cooling Plate for EV Aluminium Water Cold Housing Liquid Cooling EnclosureCooling Plate for EV Aluminium Water Cold Housing Liquid Cooling Enclosure

Packing Details:

Regarding the packaging of  heatsink, it depends on the product volume and size, and also most important requirement from clients.
Usually, the carton is used to pack all the parts.
In some cases, the wooden case is used to pack several cartons together. 
Cooling Plate for EV Aluminium Water Cold Housing Liquid Cooling Enclosure

 FAQ:

1. Q: Are you factory or trading company?
A: We  a company that integrates factory and trade.
2. Q: Where is your factory located?
A: It is located in Huizhou city, GongDong Province, China.
3. Q: Can I get sample before making order?
A: We can provide samples if you tell us the exact model and size , or you send us your drawing for new sample building.
4. Q: Do you accept small order or trial order?
A: Small order and trial order are acceptable.
5. Q: How long can I get a sample?
A: If there is samples in stock, we can send it within one day, and the normal LT for new prototype is around 3-4 weeks
6. Q: How do you inspect goods?
A: We will provide FAI report in each batch before mass production. All goods will be inspected before packing.
7. Q: What's your payment term?
A: For small order, we need 100% before production to save time and bank charge ; and 50%TT deposit 50%TT before delivery For bulk order, .

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2024

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company
Management System Certification
ISO 9001, IATF16949
Export Year
2013-06-08